Mission Hills: LA's First Experience-Driven Charging™ Hub Is Coming

Happy Thanksgiving from EV Initiative. Los Angeles is getting a new kind of charging stop. Our Mission Hills hub, at 15555 San Fernando Mission Blvd in the San Fernando Valley, will be the first Experience-Driven Charging™ destination: 18 Tesla V4 fast-charging stalls built around food, coffee, clean restrooms and a safe, secure place to wait. Here's where the project stands, what comes next, and why we're more excited than ever.

First, thank you. More than 3,400 people invested over $2 million to make Mission Hills America's first fractionally owned EV charging hub. This site belongs to the community it serves, and that's exactly how we want it.
Mission Hills at a glance
- Location: 15555 San Fernando Mission Blvd, Mission Hills, Los Angeles, CA 91345, near the I-405, SR-118 and I-5
- Charging: 18 Tesla V4 fast-charging stalls under architectural canopies, including accessible stalls
- Hospitality: a vending and amenity building with restrooms and a robotic barista, plus a permanent food trailer
- Safety: bright lighting and AI-monitored security cameras, open 24/7
- Built by: EV Initiative, through EV Initiative Infrastructure (EVII™)
- Status: final plan check responses going to the City of Los Angeles, with permits targeted for early 2027
- Expected opening: 2027, most likely the fourth quarter
What is Experience-Driven Charging™?
Most chargers sit in the back corner of a parking lot. You plug in, check your phone and wait. Experience-Driven Charging™ flips that. We design the destination first, around the time a driver actually spends there, and put fast charging at the center of it.
That means hospitality first. Grab a coffee from the robotic barista. Order tacos, shawarma, a smash burger or a salad from the food trailer. Use a clean restroom. Wait somewhere well lit, watched over and comfortable, at noon or at midnight. Then pull away fully charged. This is what charging should feel like.
Here is the same corner two ways: first from our architectural drawings, then as a realistic rendering of what drivers will see.


Where is the project today?
Mission Hills is in plan check with the City of Los Angeles. The City reviewed our first submission and returned corrections, which is normal for a ground-up project. Our team has now answered every one of them. Coffman Engineers completed the civil, structural, mechanical, plumbing, electrical and telecom drawings, and our architect, Guy Turner, is finishing the architectural set this week.
Tesla's engineering team has approved our stall layout. We redesigned the site to get there, shifting the parking and narrowing the amenity building so every stall meets Tesla's full-size standard and the hub appears in Tesla navigation. The final design carries 18 Tesla V4 stalls, with every charging post centered on its stall.

The complete response set goes to the City next week.
When will Mission Hills open?
Once the City clears our responses, permits are issued. We're targeting early 2027. We sign the construction contract and order equipment only after permits are in hand, so every dollar goes into a project that is ready to build.
Our contractor bids put construction at about six months, through final inspection and the certificate of occupancy. Doors open the day that certificate arrives. At today's pace, that puts opening in 2027, most likely the fourth quarter.
Yes, that's later than we first hoped. Building something first-of-its-kind in Los Angeles means careful review with the City, LADWP and County Public Health, and we'd rather get it right than get it fast. This hub is built to serve the Valley for decades and host millions of charging sessions over its life. A few extra months now is a small price for a foundation that lasts.

Critical infrastructure, hospitality first
As more drivers, rideshare fleets and autonomous vehicles go electric, reliable fast charging becomes critical infrastructure for Los Angeles. Mission Hills treats it that way, with dedicated utility service, durable Tesla V4 hardware and round-the-clock security. Then it wraps all of it in hospitality, because the people charging deserve more than a parking spot and a plug.
Mission Hills is the flagship. It proves what a charging stop can be, and it sets the standard for the Experience-Driven Charging™ hubs that follow across Los Angeles.
From me and the entire EV Initiative team: thank you for believing early. Enjoy the day with the people you love.
Warren Navarro, Co-Founder & COO, EV Initiative
