Issue for Construction (IFC) Design Milestone Schedule

This scope, which is a follow-up to the Permitting Timeline Summary that was sent to you on March 13, 2025, details the efforts involved in developing the design to the IFC level.
ASR-2 SCOPE OF WORK:
The general scope of services pursuant to ASR-2 includes electrical, structural, and civil design services with major milestones defined at 60%, 90%/Issue for Permit (IFP), and IFC stages.
We are now in the 60% design phase. A complete milestone schedule can be found below.
edited_2025.03.20 ASR-2_Mission Hills EV Charging_IFC Design.pdf